This activity refers to the planned collection and extraction of riverbed-deposited materials such as sand, gravel, boulders, and other alluvial deposits from Puwa Khola, specifically within the designated area of Ward No. 6 (Futuk). The purpose of this operation is to utilize locally available construction materials for infrastructure development, ensure regulated extraction in accordance with environmental and legal standards, and contribute to municipal revenue generation while maintaining river ecology and stability.