This Project covers the continuation of the building construction project as part of Phase II. The works included in this phase are as follows: Structural Works "(i)RCC frame structure (columns, beams, slab) Including Underground Water Tank Semi Structure . (ii) Masonry works (Brick wall ). Bricks for Staircase Wall Structure Below Ground Level/ Ground Level Miscellaneous Works (i) Site preparation with back filling around Building and minor external works as included in this estimate.