Construction of Asphalt Concrete Road Works consisting of Major Works of Retaining Structure: Gabion Works-968 cum, Roadside drainage Structure: Stone Masonary Works-663.09cum, M15-228.26cum, M20-270cum, Reinforcement-8.268 MT, Blacktopped Road Works: Subbase works-1425cum, Base works-1154.25cum, Asphalt Concrete-291.6cum