Design and Construction of Tinau Bridge and Approach Roads at Ch. Km. 589+000 of E/W Highway (NH 01) on Upstream and Downstream of the Existing Tinau Bridge each to two lane Carriageway, footpath on one side and Approach Road and Approximate Length of Bridge and Approach Roads are 240 m and 980 m minimum respectively.