The Work Consist of RCC work (concrete, formwork, re bar work), brick work, plaster work, UPVC door/window Work, Steel Railing Work, CGI sheet roof work with metal work, electrical and allied works, sanitary and allied works for the construction of third and fourth floor of proposed educational building