Mewa-Changhe (Dhungesanghu) 132kV double circuit line is of about total 20 km length with ACSR Bear conductor. This project is proposed to evacuate around 165 MW of power from number of hydropower projects. This TL originates from Mewa Substation at Taplejung District to Dhungesangu substation of Taplejung District, and the scope of work includes the construction of proposed transmission line along with construction of Mewa substation and bay extension works at Dhungesaghu substation.