Transportation of All Line Material to Working Site From Vehicle and Labour, Polling of 8/11 meter Steel Tubular Pole, Stringing of 11 KV and 0.4 KV(ABC Cable), Transformer installation, GIS mapping and submission of Material and Labour Detail with as built diagram in GIS Map of all Major Item in BOQ, Charging, Testing and Commissioning of all the Line etc.