The River Protection Works (Phase II) consist of : -Construction of RCC Wall, Counterfort wall. -Providing, Boring and Installing Bored cast in-situ RCC Pile (750mm-1000mm, 1200 mm) -Providing and Laying of Plum Concrete -Supply and Installation of Soil nails 32mm dia. -Providing and laying apron on RIver Bed for protection against scour -Dismantling of structure and earthwork. and Hardrock. -River bank protection by providing, mixing and laying of Cement stablished river bed material.