The Nagawa-Bishrampur-Musaharwa-Kantipur-Barainiya-Chhatawa-Khekhariya Road connects settlement of Musharniya (Bishrampur RM-1), Kantipur (Bishrampur RM-3), Barainiya (Bishrampur RM-2), Chhatawa, Khekhariya (Bishrampur RM-1), Pachhiyahi Tol, Puraniya (Pheta RM-3), Inerwa, Pachainpur, Pataura, Sishahaniya (Kalaiya SMC-19) and end at Sishahaniya chowk of Birgunj-Kalaiya Road. Total length of this road is 13.74 km. This road provides accessibility with other roads within the region. The upgrading work of this road was implemented through the SNRTP project up to the DBSD level in fiscal year 2075/076. The minor periodic maintenance (very little pothole repair) had done in last 6 years through the relative palika and IDO. The road surface condition of this road is poor and most of the places, base and subbase is also exposed and need to be urgent periodic maintenance to reduce the further damage of the surface.