Earth work in Excavation, Construction of the Gabion structures, Managing the cross Drainage by installing the Hume pipe, construction of Catchpit, etc for protection of the Tower No. 58 (Gongar- Khimti 220 KV transmission Line)of Upper Tamakoshi Hydropower Plant