The work shall include mobilization of necessary equipment, payment of compensation for the damaged crops to the respective landowners during fieldwork and for access of testing location, providing necessary engineering supervision and technical personnel, skilled and unskilled labour etc. as required to carry out field investigation as well as, laboratory investigation, analysis and interpretation of data and results, preparation of detailed Geo-technical report including specific recommendations for the type of foundations, the allowable safe bearing capacity for different sizes of foundations at different founding strata for the various structures of the substation and suitable method to mitigate the liquefaction problem if necessary at substation site.