The proposed road improvement work includes upgrading of existing road. It comprises construction of a Flexible Pavement(Premix Carpet) in first section and rigid pavement in Rest of Section. This requires Road construction with site clearance, excavation side cutting, Stone Soling, Re Bar, and RCC works. The proposed alignment will also have side drains, cross drainage structures (Causeway), protection works, etc. as all works required in BOQ.